Connection to the power grid: you already have installed photovoltaic panels and want to obtain prosumer certification

Stages for connection to the power grid if you already have installed photovoltaic panels and want to obtain prosumer certification
You may find yourself in this situation if you installed photovoltaic panels at home before the legislation regarding prosumer certification was updated. To obtain prosumer certification, you need to follow the steps below:
Submitting the necessary documentation for obtaining the prosumer certification
Responsible:
prosumatorEstimated duration:
1 calendar dayTo officially become a prosumer, you need to send us a notification (Appendix 3).
After downloading and completing the notification, it is important to submit it to us.
You can send the completed notification directly from your online account.
Besides the notification, we expect additional documents from you, which are mentioned in the notification.
Application review and documentation verification
Responsible:
distributorRegulated duration:
2 working daysWe will review the submitted notification and supporting documents and will contact you within a maximum of 2 working days.
You will receive our response in your online account.
Issuing the connection to the power grid certificate
Responsible:
distributorRegulated duration:
3 working daysWe will issue the connection to the power grid certificate within a maximum of 3 working days.
This certifies the presence of a new consumption and production point in the network.
Signing the supply contract
Responsible:
prosumerEstimated duration:
1 working daySign a contract with an electricity supplier so you can sell the energy produced at home that is not used for your own consumption.
You might also be interested in:

Terms for everyone to understand

Requests and useful documents for connection to the power grid