The Large Infrastructure Operational Program (POIM)

The Large Infrastructure Operational Program (POIM) was developed to respond to Romania’s development needs, as identified in the Partnership Agreement 2014-2020 and in accordance with the Common Strategic Framework and the European Commission’s Service Position Paper.
Stalpi de inalta tensiune transportand energie electrica printr-o zona verde, parte din reteaua nationala de distributie a electricitatii prezentata pe reteleelectrice.ro

The projects we have underway can be found under Priority Axis 10 – Protecting the health of the population in the context of the sanitary crisis caused by COVID-19, increasing energy efficiency, and using renewable energy sources. Specific Objective 10.2 – Increasing energy efficiency and using renewable energy sources in order to prepare for a green, digital, and resilient economic recovery. The total amount allocated for the entire Axis 10 is €700,057,177.00, of which the EU funds (FEDR-REACT EU) represent €700,057,177.00.

Muntenia

Learn more about the projects we have underway, funded through the Large Infrastructure Operational Program (POIM), in the Muntenia region!

Learn more

Banat

Learn more about the projects we have underway, funded through the Large Infrastructure Operational Program (POIM), in the Banat region!

Learn more

Dobrogea

Learn more about the projects we have underway, funded through the Large Infrastructure Operational Program (POIM), in the Dobrogea region!

Municipality of Constanța

Constanța, Medgidia, Nazarcea, Mircea Vodă