Large Infrastructure Operational Program (POIM) in the Banat area

In Banat, we are implementing the project “Smart interventions for optimizing consumption for end customers and improving the quality of the distribution service through the use of high-quality consumption data in Timiș county,” funded through the Large Infrastructure Operational Program (POIM).
Harta regiunii vestice a Romaniei cu judetele Arad (AR), Timis (TM), Caras-Severin (CS) si Hunedoara (HD), parte din reteaua de distributie a energiei electrice prezentata pe reteleelectrice.ro

Project: “Smart interventions for optimizing consumption for end customers and improving the quality of the distribution service through the use of high-quality consumption data in Timiș county”

Funding source: Large Infrastructure Operational Program 2014-2020

Priority Axis 10:

Protecting public health in the context of the COVID-19 health crisis, increasing energy efficiency, and using renewable energy sources, funded by REACT-EU.

Specific objective 10.2.:

Increasing energy efficiency and using renewable energy sources to support a green, digital, and resilient economic recovery.

Call:

POIM/970/10/2/Increasing energy efficiency and using renewable energy sources to support a green, digital, and resilient economic recovery.

General objective 

is to invest in energy infrastructure in the homogeneous zone of Timiș county and implement an integrated ADMS platform and an Analytics platform, which will contribute to reducing the average household energy consumption and improving the quality of the distribution service.

Total value

The total value is 45,639,863.69 RON, of which the total eligible amount funded through the Large Infrastructure Operational Program 2014-2020 is 35,896,838.99 RON (100% of the total approved eligible value).

Through this project, with a total duration of 45 months (01.04.2020 – 31.12.2023), a smart network area will be created, allowing end customers to benefit from higher-quality services at a standardized level. This will enable them to predictably adjust their consumption behavior, leading to reduced individual consumption and increased energy efficiency through the implementation of the following components:

Component C1

Consists of an Analytics subsystem (platform) for the measurement-collection process, located in the Cloud.

Component C2

Consists of an integrated ADMS (Advanced Distribution Management System) platform. This component includes a new DMS/EMS module and integration with existing SCADA and OMS modules.

Component C3

Consists of the rehabilitation and/or modernization of the distribution network at low/medium voltage levels in the homogeneous network zone.

Rețele Electrice Banat has completed the first phase of modernizing the energy infrastructure in Timișoara through a project worth over 46 million RON, co-financed through POIM 2014-2020.
pdf (233.23 KB)