Muntenia, Dascălu and Petrăchioaia, Ilfov

Dascălu and Petrăchioaia, Ilfov county
Project: “Increasing the reliability of the electricity supply in the localities of Dascălu and Petrăchioaia by modernizing the Petrăchioaia line, Ilfov county”
Total value, including the financing percentage through the Modernization Fund
The total project value is 76,469,876.11 RON, including VAT.
The maximum amount covered by the Modernization Fund is 80% of the eligible expenses, equivalent to 50,578,291.16 RON.
The amount covered by the beneficiary (REM) is 25,891,584.95 RON, including VAT.
Location and identification of each investment:
The project will be implemented in the Southern region, Ilfov county.
The investment objective is located throughout most of the UATs of Dascălu and Petrăchioaia and on certain sections of the UATs of Ștefănești and Afumați, in both urban and rural areas, on public land along roadways. The land where the works will be carried out belongs to the public domain of the UATs Dascălu, Petrăchioaia, Ștefănești, and Afumați.
Main project activities
The investment project consists of the following components:

Component C1:
Modernization of the 20 kV Petrăchioaia LEA, including route reconfiguration and reliability enhancement by converting LEA to LES.

Component C2:
Modernization, establishment, and reconfiguration of substations. Conversion of existing substations into fully equipped new PTAB units. Integration of new or reconfigured PTAB units into the LV distribution network. The associated MV and LV networks will be reconfigured.

Component C3:
Modernization of transformer stations, including the installation of remote control equipment and integration into SCADA/ADMS. Expansion and modernization of the communication network, transitioning to more secure fiber optic communications. Expansion of LV network monitoring to ensure the quality of energy delivered to consumers.

Component C4:
Development of technical spaces and securing operations and access to electrical installations. Installation of anti-intrusion systems in all transformer stations within the project’s area of application.
By implementing the above components, the project aims to achieve the following:
- Reduction of operating costs, which is a performance parameter imposed by ANRE and influences the costs included in the distribution rate paid by consumers.
- Increase in distribution capacity and reliability of the modernized MV and LV network, ensuring energy supply at European standards.
- Improvement of service continuity and reduction of the effects of unplanned outages. Reduction of service interruption times and the number of faults/incidents caused by equipment failures during operation due to exceeding normal load or other consumption imbalances, while enabling better planning of these parameters at the network level.
- Reduction of technical losses and more efficient energy use through the introduction of remote control and the integration of the MV/LV network into centralized monitoring, command, and control systems (ADMS/SCADA).
- Reconfiguration of the MV distribution network, transitioning from overhead to underground MV networks where possible, as well as rerouting cable paths onto public land to improve accessibility for interventions and maintenance.
- Increase in network intelligence, expansion of monitoring capabilities, and integration into the centralized remote control system (SCADA/ADMS), allowing direct, automated, and high-performance energy distribution management.
- Use of video surveillance to deter vandalism of installations and assist in diagnosing potential faults under extreme weather conditions.
Project indicators
Nr. crt. | Indicator | INITIAL VALUE at the beginning of the implementation period (average 2014-2021) | TARGET VALUE at the end of the implementation period |
---|---|---|---|
1 | SAIDI reduction [minutes/consumer] | 0.408 | 0.359 |
2 | SAIFI reduction [interruptions/consumer] | 0.014 | 0.012 |
3 | Technical losses (CPT) reduction [MWh/year] | 722.28 | 361.14 |
4 | CO2 emissions reduction [tons/year] | – | Approx. 119 |
5 | Number of new consumers that can be connected | 0 | Approx. 76 |
6 | Number of new producers that can be connected | 0 | Approx. 735 |
Contact details for feedback and inquiries regarding project implementation: fonduri_europene@reteleelectrice.ro.