Dobrogea, Perișoru

Perișoru, Călărași county
Project: “Modernization of the 20 kV LEA in Perișoru, Călărași county”
Total value, including the financing percentage through the Modernization Fund
The total project value is 96,459,978.33 RON, VAT included.
The maximum amount covered by the Modernization Fund is 80% of the eligible expenses, equivalent to 57,053,899.19 RON.
The amount covered by the beneficiary (RED) is 39,406,079.14 RON, VAT included.
Location and identification of each investment:
The investment objective is located in the Eastern Region, Călărași county, within the urban area of Perișoru.
Main project activities
The investment project consists of the following components:

Component C1:
Modernization of neutral treatment groups in the Ștefan cel Mare station.

Component C2:
Modernization of the 20 kV LEA in Perișoru.

Component C3:
Modernization, establishment of PCs and PTAB units, conversion of PTA units into PTAB units, relocation and replacement of PCZ units with PTAB units.

Component C4:
Modernization of PT/PC units, installation of remote control equipment, and integration into SCADA/ADMS. Expansion of modernization through LV network monitoring with quality analyzers in new PT units. Installation of anti-intrusion systems at PT/PC units. Preparation for the introduction of new communication technologies for the digital remote monitoring and control system.

Component C5:
Integration of new PTAB units into the LV network.

Component C6:
Modernization of LV lines (power and lighting) and connections in Ștefan cel Mare and Perișoru localities.

Component C7:
Reconstruction of subscriber distribution columns.
Project objectives, aligned with those of the Modernization Fund:
- Modernization of 20 kV neutral treatment groups in the Ștefan cel Mare electrical station by upgrading 2 neutral treatment groups for each section of the MV busbar.
- Modernization/reconfiguration of the 20 kV Overhead Power Line (LEA) in Perișoru, supplied from the 110/20/6 kV Ștefan cel Mare transformer station.
- Modernization, including the establishment and relocation from private to public land, of a total of 17 transformer stations and 3 connection points within the 20 kV LEA in Perișoru.
- Migration of the communication system to a fiber optic network (for data exchange between RTU-MT and SCADA/ADMS).
- Expansion of LV distribution network monitoring at the transformer station output level by installing 17 quality analyzers and ensuring compliance with performance standards imposed by ANRE.
- Securing operations and access to electrical installations by installing anti-intrusion systems for each of the 20 newly installed PT/PC units.
- Integration of new PTAB units into the LV network.
- Modernization/reconfiguration of the overhead LV network Ștefan cel Mare and Perișoru localities.
- Modernization of connections and relocation of metering units to the property boundary for 2,515 consumers in Ștefan cel Mare and Perișoru localities.
- Reconstruction of distribution columns.
Project indicators
Nr. crt. | Indicator | TARGET VALUE at the end of the implementation period |
---|---|---|
1 | SAIDI reduction [minutes/consumer] | Approx. 50% improvement compared to the average of the last 5 years |
2 | SAIFI reduction [interruptions/consumer] | Approx. 42% reduction for monitoring years compared to the average of the last 5 years |
3 | Technical losses (CPT) reduction [MWh/year] | Approx. 62% |
4 | CO2 emissions reduction [tons/year] | Approx. 62% |
5 | Number of new consumers that can be connected | 250 |
6 | Number of new producers that can be connected | 2,456 |
Contact details for feedback and inquiries regarding project implementation: fonduri_europene@reteleelectrice.ro.