{"id":19775,"date":"2024-10-17T07:49:32","date_gmt":"2024-10-17T07:49:32","guid":{"rendered":"https:\/\/www.reteleelectrice.ro\/funded-projects\/the-modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/"},"modified":"2025-07-16T12:38:25","modified_gmt":"2025-07-16T12:38:25","slug":"dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni","status":"publish","type":"page","link":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","title":{"rendered":"Dobrogea, Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, Fundeni"},"content":{"rendered":"<body><p><!--  ADD patern code from wp code editor --><\/p>\n\n    <section id=\"\" class=\"block-hero\">\n                    <div class=\"top-hero\">\n                <div class=\"left\">\n                                                                                    <h1 class=\"title-hero\">Modernization Project in Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, C\u0103l\u0103ra\u0219i county<\/h1>\n                                                                <div class=\"text-hero\"> One of our projects carried out through the Modernization Fund in the Dobrogea region aims to modernize the distribution network in  Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, in C\u0103l\u0103ra\u0219i county.<\/div>\n                                                        <\/div>\n                        <div class=\"right\">\n                <img loading=\"lazy\" decoding=\"async\" width=\"920\" height=\"400\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp?w=920&amp;h=400&amp;crop=1\" class=\"attachment-hero size-hero\" alt=\"Proiect de modernizare \u00een localit\u0103\u021bile din jude\u021bul C\u0103l\u0103ra\u0219i.\" srcset=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp 920w, https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp?resize=300,130 300w, https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp?resize=768,334 768w, https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp?resize=152,66 152w\" sizes=\"auto, (max-width: 920px) 100vw, 920px\">                <style type=\"text\/css\">\n                    @media only screen and (max-width: 1200px) {\n                        .block-hero .top-hero .main-slide .right img {\n                            object-position:\n                            0                                % 0%;\n                        }\n                    }\n                <\/style>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<section id=\"\" class=\"block-breadcrumbs\">\n    <ul id=\"breadcrumbs\" itemprop=\"breadcrumb\" class=\"breadcrumbs\"><li><a rel=\"home\" href=\"https:\/\/www.reteleelectrice.ro\/en\/\"><\/a><\/li><\/ul><\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column first-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-6c531013 wp-block-group-is-layout-flex\">\n<h4 class=\"wp-block-heading\" id=\"h-frumu\u0219ani-vasila\u021bi-galbina\u0219i-platare\u0219ti-and-fundeni-calara\u0219i-county\">Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, C\u0103l\u0103ra\u0219i county<\/h4>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1fe1f53f wp-block-columns-is-layout-flex\" style=\"border-style:none;border-width:0px;border-radius:0px;padding-top:20px;padding-bottom:20px\">\n<div class=\"wp-block-column is-layout-flow wp-container-core-column-is-layout-e099ce20 wp-block-column-is-layout-flow\" style=\"border-style:none;border-width:0px;padding-top:0rem;padding-right:0;padding-bottom:0rem;padding-left:0;flex-basis:66.66%\">\n<p style=\"font-size:18px\"><strong>Project<\/strong>: \u201cModernization of the electricity distribution network to increase capacity and safety in the power supply for consumers in the Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, C\u0103l\u0103ra\u0219i county.\u201d<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"border-style:none;border-width:0px;padding-top:0;padding-right:0;padding-bottom:0;padding-left:0;flex-basis:33.33%\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<\/div> \n        <\/div>\n    <\/div>\n<\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<p style=\"padding-bottom:16px;font-size:20px\"><strong>Total value, including the financing percentage through the Modernization Fund<\/strong>:<\/p>\n\n\n<section id=\"\" class=\"block-customcolumns \">\n    <div class=\"column-blocks\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<p>The total project value is <strong>162,176,967.42 RON<\/strong>, VAT included.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<p>The maximum amount covered by the Modernization Fund is 80% of the eligible expenses, equivalent to <strong>106,736,107.68 RON<\/strong>.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<p>The amount covered by the beneficiary (RED) is <strong>55,440,859.74 RON<\/strong>, VAT included.<\/p>\n<\/div>\n<\/div>\n\n<\/div>\n<\/section>\n<\/div> \n        <\/div>\n    <\/div>\n<\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p style=\"padding-bottom:16px;font-size:20px\"><strong>Location and identification of each investment<\/strong>:<\/p>\n\n\n\n<p>The investment objective is located in the town of Bude\u0219ti (both urban and rural areas), the village of Gruiu, and the rural area of Buciumeni village, as well as in the urban and rural areas of the communes Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, with the following associated localities: Frumu\u0219ani, Or\u0103\u0219ti, Pas\u0103rea, P\u0103duri\u0219u, Pi\u021bigaia, Post\u0103vari, Vasila\u021bi, Pope\u0219ti, G\u0103lbina\u021bi, Pl\u0103t\u0103re\u0219ti, and Fundeni.<br>The land where the works will be carried out belongs to the public domain of the town of Bude\u0219ti and the communes of Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, as well as the private domain of individuals and\/or legal entities.<\/p>\n<\/div>\n<\/div>\n\n<\/div> \n        <\/div>\n    <\/div>\n<\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<p style=\"padding-bottom:8px;font-size:20px\"><strong>Main project activities<\/strong><\/p>\n\n\n\n<p style=\"padding-bottom:16px\">The investment project consists of the following components:<\/p>\n\n\n<section id=\"\" class=\"block-customcolumns \">\n    <div class=\"column-blocks\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c1.png\" alt=\"\" class=\"wp-image-1919\" style=\"object-fit:cover;width:64px;height:64px\"><\/figure>\n\n\n\n<p><strong>Component C1<\/strong>:<br>Increase the capacity and modernize the equipment in the Bude\u0219ti station.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c2.png\" alt=\"\" class=\"wp-image-1920\" style=\"object-fit:cover;width:64px;height:64px\"><\/figure>\n\n\n\n<p><strong>Component C2<\/strong>:<br>Establish a new 20 kV line and reconfigure and modernize the 20 kV Post\u0103vari and Fundeni lines, with departures from the 110\/20 kV Bude\u0219ti power station.<\/p>\n<\/div>\n<\/div>\n\n<\/div>\n<\/section>\n\n<section id=\"\" class=\"block-customcolumns \">\n    <div class=\"column-blocks\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-5f5cb005 wp-block-columns-is-layout-flex\" style=\"margin-top:24px;margin-bottom:24px\">\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c3.png\" alt=\"\" class=\"wp-image-1921\"><\/figure>\n\n\n\n<p><strong>Component C3<\/strong>:<br>Modernize substations (PTA\/PCZ\/PTAB) by replacing them with new PTAB units, modernize an existing PTA, and expand the distribution capacity by installing new substations (PTAB\/PC) and reconfiguring existing PCZ\/PC units.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c4.png\" alt=\"\" class=\"wp-image-1922\"><\/figure>\n\n\n\n<p><strong>Component C4<\/strong>:<br>Modernize planned, redesigned, and partially modernized substations by introducing digital measurement equipment, installing remote control devices, and integrating them into SCADA\/ADMS. Extend LV network monitoring to ensure power quality by installing quality analyzers. Enhance operational security and restrict access to electrical installations by implementing anti-intrusion systems. Develop infrastructure based on a fiber optic network for secure communications.<\/p>\n<\/div>\n<\/div>\n\n<\/div>\n<\/section>\n\n<section id=\"\" class=\"block-customcolumns \">\n    <div class=\"column-blocks\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-5f5cb005 wp-block-columns-is-layout-flex\" style=\"margin-top:24px;margin-bottom:24px\">\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c5.png\" alt=\"\" class=\"wp-image-1991\"><\/figure>\n\n\n\n<p><strong>Component C5<\/strong>:<br>Integrate new substations into the existing LV distribution network.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c6.png\" alt=\"\" class=\"wp-image-1992\"><\/figure>\n\n\n\n<p><strong>Component C6<\/strong>:\u00a0<br>Modernize LV lines (power and lighting), upgrade connections for 148 LV consumers in Pl\u0103t\u0103re\u0219ti, and relocate metering and protection groups to public land.<\/p>\n<\/div>\n<\/div>\n\n<\/div>\n<\/section>\n\n<section id=\"\" class=\"block-customcolumns \">\n    <div class=\"column-blocks\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-5f5cb005 wp-block-columns-is-layout-flex\" style=\"margin-top:24px;margin-bottom:24px\">\n<div class=\"wp-block-column has-dirty-white-background-color has-background is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"64\" height=\"64\" src=\"http:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/c7.png\" alt=\"\" class=\"wp-image-1993\"><\/figure>\n\n\n\n<p><strong>Component C7<\/strong>:<br>Replace distribution columns for 148 LV consumers in the area where the LV overhead line is being modernized. Outside the project scope, the applicant is implementing a rollout plan, as required by ANRE, to digitize energy measurement using own funds (recoverable through the distribution tariff), to define a planned SMI (Smart Metering Infrastructure) architecture. This project will install smart meters for residential and non-residential consumers and introduce network monitoring capabilities at the consumption point level.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"border-style:none;border-width:0px\"><\/div>\n<\/div>\n\n<\/div>\n<\/section>\n<\/div> \n        <\/div>\n    <\/div>\n<\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p style=\"padding-bottom:16px;font-size:20px\"><strong>By implementing the above components, the project aims to achieve the following:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li style=\"padding-bottom:16px\">Reduce operating costs, which is a performance parameter imposed by ANRE and influences the costs included in the distribution tariff paid by consumers.<\/li>\n\n\n\n<li style=\"padding-bottom:16px\">Increase distribution capacity and reliability for the modernized MV and LV network, ensuring energy supply at European standards. Improve service continuity and reduce the impact of unplanned outages. Decrease service interruption times and the number of faults\/incidents caused by equipment failures due to normal load exceedance or consumption imbalances, while enabling better network planning.<\/li>\n\n\n\n<li style=\"padding-bottom:16px\">Reduce technical losses and optimize energy use by introducing remote control and integrating the MV\/LV network into centralized monitoring, command, and control systems (ADMS\/SCADA).<\/li>\n\n\n\n<li style=\"padding-bottom:16px\">Reconfigure the MV distribution network, transition from overhead to underground MV networks where possible, and relocate cable routes to public land to improve accessibility for interventions and maintenance.<\/li>\n\n\n\n<li style=\"padding-bottom:16px\">Enhance network intelligence, expand monitoring capabilities, and integrate the network into the centralized remote control system (SCADA\/ADMS) for direct, automated, and high-performance electricity distribution management.<\/li>\n\n\n\n<li style=\"padding-bottom:16px\">Implement video surveillance of facilities to deter vandalism and assist in diagnosing potential faults under extreme weather conditions.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><\/div>\n<\/div>\n\n<\/div> \n        <\/div>\n    <\/div>\n<\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<p style=\"font-size:20px\"><strong>Project indicators<\/strong><\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p style=\"padding-bottom:16px;font-size:16px\">The investment project consists of the following components:<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"border-style:none;border-width:0px;padding-top:0;padding-right:0;padding-bottom:0;padding-left:0;flex-basis:100%\">\n<figure class=\"wp-block-table alignleft is-style-stripes\"><table style=\"border-width:1px\" class=\"custom-table\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\" scope=\"col\">Nr. crt.<\/th><th class=\"has-text-align-left\" data-align=\"left\" scope=\"col\">Indicator<\/th><th class=\"has-text-align-left\" data-align=\"left\" scope=\"col\">Initial value at the beginning of the implementation period (average 2018-2022)<\/th><th class=\"has-text-align-left\" data-align=\"left\" scope=\"col\">TARGET VALUE at the end of the implementation period<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Nr. crt.\">1<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Indicator\">SAIDI reduction [minutes\/consumer]<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Initial value at the beginning of the implementation period (average 2018-2022)\">1.5702<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"TARGET VALUE at the end of the implementation period\">1.1895<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Nr. crt.\">2<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Indicator\">SAIFI reduction [number of interruptions\/consumer]<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Initial value at the beginning of the implementation period (average 2018-2022)\">0.0466<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"TARGET VALUE at the end of the implementation period\">0.03527<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Nr. crt.\">3<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Indicator\">Technical losses (CPT) reduction [MWh\/year]<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Initial value at the beginning of the implementation period (average 2018-2022)\">4,886.34<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"TARGET VALUE at the end of the implementation period\">2,471.81<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Nr. crt.\">4<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Indicator\">CO2 emissions reduction [tons\/year]<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Initial value at the beginning of the implementation period (average 2018-2022)\">1,612.49<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"TARGET VALUE at the end of the implementation period\">796.8<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Nr. crt.\">5<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Indicator\">Number of new consumers that can be connected<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Initial value at the beginning of the implementation period (average 2018-2022)\">0<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"TARGET VALUE at the end of the implementation period\">About 320<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Nr. crt.\">6<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Indicator\">Number of new producers that can be connected<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"Initial value at the beginning of the implementation period (average 2018-2022)\">0<\/td><td class=\"has-text-align-left\" data-align=\"left\" data-label=\"TARGET VALUE at the end of the implementation period\">About 6,982<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Contact details for feedback and inquiries regarding project implementation:<\/strong> <strong><a href=\"mailto:fonduri_europene@reteleelectrice.ro\">fonduri_europene@reteleelectrice.ro<\/a>.<\/strong><\/p>\n<\/div>\n<\/div>\n\n<\/div> \n        <\/div>\n    <\/div>\n<\/section>\n\n<section id=\"\" class=\"block-whitecontainer\">\n    <div id=\"page-wrap\">\n        <div class=\"tabs\">\n            <div class=\"acf-innerblocks-container\">\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p style=\"font-size:20px\"><strong>Press release<\/strong><\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n    <section id=\"\" class=\"block-document\">\n        <div class=\"document\">\n            <div class=\"left-document\">\n                 \n                \n                <div class=\"title-document\">Modernization Project in the Localities of Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, and Fundeni, C\u0103l\u0103ra\u0219i county<\/div>\n                \n                                    <div class=\"document-type-download\">\n                                                    <div class=\"size-document size-document-type-pdf\">\n                                pdf (143.26 KB)                            <\/div>\n                                            <\/div>\n                            <\/div>\n            \n                            <a href=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/dobrogea-cp-fm-frumusani.pdf\" download class=\"right-document global-button global-button-transparent button-arrow-transparent\">Download<\/a>\n            <\/div>\n            <\/section><\/div>\n    \n<\/div>\n<\/div>\n\n<\/div> \n        <\/div>\n    \n<\/section><\/body>","protected":false},"excerpt":{"rendered":"<p>One of our projects aims to modernize the distribution network in 5 localities in C\u0103l\u0103ra\u0219i county, Dobrogea area.<\/p>\n","protected":false},"author":15,"featured_media":9877,"parent":19241,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19775","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Modernization project in 5 localities in Calarasi | Retele Electrice<\/title>\n<meta name=\"description\" content=\"One of our projects aims to modernize the distribution network in 5 localities in Calarasi county, Dobrogea area.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modernization project in 5 localities in C\u0103l\u0103ra\u0219i | Re\u021bele Electrice\" \/>\n<meta property=\"og:description\" content=\"One of our projects aims to modernize the distribution network in 5 localities in C\u0103l\u0103ra\u0219i county, Dobrogea area.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/\" \/>\n<meta property=\"og:site_name\" content=\"reteleelectrice\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-16T12:38:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"920\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Modernization project in 5 localities in C\u0103l\u0103ra\u0219i | Re\u021bele Electrice\" \/>\n<meta name=\"twitter:description\" content=\"One of our projects aims to modernize the distribution network in 5 localities in C\u0103l\u0103ra\u0219i county, Dobrogea area.\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/\",\"url\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/\",\"name\":\"Modernization project in 5 localities in Calarasi | Retele Electrice\",\"isPartOf\":{\"@id\":\"https:\/\/www.reteleelectrice.ro\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp\",\"datePublished\":\"2024-10-17T07:49:32+00:00\",\"dateModified\":\"2025-07-16T12:38:25+00:00\",\"description\":\"One of our projects aims to modernize the distribution network in 5 localities in Calarasi county, Dobrogea area.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#primaryimage\",\"url\":\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp\",\"contentUrl\":\"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp\",\"width\":920,\"height\":400,\"caption\":\"Modernization project in the localities of C\u0103l\u0103ra\u0219i County.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.reteleelectrice.ro\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Funded projects\",\"item\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"The Modernization Fund\",\"item\":\"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Dobrogea, Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, Fundeni\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.reteleelectrice.ro\/#website\",\"url\":\"https:\/\/www.reteleelectrice.ro\/\",\"name\":\"reteleelectrice\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.reteleelectrice.ro\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Modernization project in 5 localities in Calarasi | Retele Electrice","description":"One of our projects aims to modernize the distribution network in 5 localities in Calarasi county, Dobrogea area.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","og_locale":"en_US","og_type":"article","og_title":"Modernization project in 5 localities in C\u0103l\u0103ra\u0219i | Re\u021bele Electrice","og_description":"One of our projects aims to modernize the distribution network in 5 localities in C\u0103l\u0103ra\u0219i county, Dobrogea area.","og_url":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","og_site_name":"reteleelectrice","article_modified_time":"2025-07-16T12:38:25+00:00","og_image":[{"width":920,"height":400,"url":"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_title":"Modernization project in 5 localities in C\u0103l\u0103ra\u0219i | Re\u021bele Electrice","twitter_description":"One of our projects aims to modernize the distribution network in 5 localities in C\u0103l\u0103ra\u0219i county, Dobrogea area.","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","url":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","name":"Modernization project in 5 localities in Calarasi | Retele Electrice","isPartOf":{"@id":"https:\/\/www.reteleelectrice.ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#primaryimage"},"image":{"@id":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#primaryimage"},"thumbnailUrl":"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp","datePublished":"2024-10-17T07:49:32+00:00","dateModified":"2025-07-16T12:38:25+00:00","description":"One of our projects aims to modernize the distribution network in 5 localities in Calarasi county, Dobrogea area.","breadcrumb":{"@id":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#primaryimage","url":"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp","contentUrl":"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp","width":920,"height":400,"caption":"Modernization project in the localities of C\u0103l\u0103ra\u0219i County."},{"@type":"BreadcrumbList","@id":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.reteleelectrice.ro\/en\/"},{"@type":"ListItem","position":2,"name":"Funded projects","item":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/"},{"@type":"ListItem","position":3,"name":"The Modernization Fund","item":"https:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/"},{"@type":"ListItem","position":4,"name":"Dobrogea, Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, Fundeni"}]},{"@type":"WebSite","@id":"https:\/\/www.reteleelectrice.ro\/#website","url":"https:\/\/www.reteleelectrice.ro\/","name":"reteleelectrice","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.reteleelectrice.ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"parsely":{"version":"1.1.0","canonical_url":"https:\/\/reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"WebPage","headline":"Dobrogea, Frumu\u0219ani, Vasila\u021bi, G\u0103lbina\u0219i, Pl\u0103t\u0103re\u0219ti, Fundeni","url":"http:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/www.reteleelectrice.ro\/en\/funded-projects\/modernization-fund\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\/"},"thumbnailUrl":"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp?w=150&h=150&crop=1","image":{"@type":"ImageObject","url":"https:\/\/www.reteleelectrice.ro\/wp-content\/uploads\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp"},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Ancuta Ciocoiu"}],"creator":["Ancuta Ciocoiu"],"publisher":{"@type":"Organization","name":"reteleelectrice","logo":""},"keywords":[],"dateCreated":"2024-10-17T07:49:32Z","datePublished":"2024-10-17T07:49:32Z","dateModified":"2025-07-16T12:38:25Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"WebPage\",\"headline\":\"Dobrogea, Frumu\\u0219ani, Vasila\\u021bi, G\\u0103lbina\\u0219i, Pl\\u0103t\\u0103re\\u0219ti, Fundeni\",\"url\":\"http:\\\/\\\/www.reteleelectrice.ro\\\/en\\\/funded-projects\\\/modernization-fund\\\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.reteleelectrice.ro\\\/en\\\/funded-projects\\\/modernization-fund\\\/dobrogea-frumusani-vasilati-galbinasi-plataresti-fundeni\\\/\"},\"thumbnailUrl\":\"https:\\\/\\\/www.reteleelectrice.ro\\\/wp-content\\\/uploads\\\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp?w=150&h=150&crop=1\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.reteleelectrice.ro\\\/wp-content\\\/uploads\\\/proiecte-prin-fondul-pentru-modernizare-in-dobrogea-calarasi.webp\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Ancuta Ciocoiu\"}],\"creator\":[\"Ancuta Ciocoiu\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"reteleelectrice\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2024-10-17T07:49:32Z\",\"datePublished\":\"2024-10-17T07:49:32Z\",\"dateModified\":\"2025-07-16T12:38:25Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/reteleelectrice.ro\/p.js"},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/pages\/19775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/comments?post=19775"}],"version-history":[{"count":3,"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/pages\/19775\/revisions"}],"predecessor-version":[{"id":20703,"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/pages\/19775\/revisions\/20703"}],"up":[{"embeddable":true,"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/pages\/19241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/media\/9877"}],"wp:attachment":[{"href":"https:\/\/www.reteleelectrice.ro\/en\/wp-json\/wp\/v2\/media?parent=19775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}